Loading Plan Scrutiny
Please wait while we prepare the drawing upload interface
Initializing...
Processing Your Drawing
Analyzing building elements...
25%
Creating Application
Building Plan Application created successfullyUploading File
Uploading and processing your DXF fileExtracting Roads
Identifying road details from drawingExtracting Buildings
Identifying building details from drawingYou do not have permission to access the Plan Scrutiny page
You need appropriate permissions to access the Plan Scrutiny functionality.
Plan Scrutiny Process Guide
1
Upload Your Drawing
Start by uploading your building plan drawing and providing basic project information.
What You'll Need
- • Your building plan in DXF format
- • Zone code for your project
- • Project type selection
- • Permission type (New/Extension)
What Happens Next
- • System analyzes your drawing
- • Extracts building and road details
- • Validates drawing requirements
- • Takes you to road selection
2
Select Primary Road
Choose which road your building faces and specify road details if needed.
Your Actions
- • Review roads found in your drawing
- • Select the primary frontage road
- • Enter approved road width (if applicable)
Important
This affects setback calculations and compliance checks. Choose the road that serves as your main entrance.
3
Define Building Uses
Specify what each building will be used for and provide project details.
Information Required
- • Project title/name
- • PU Code for each building
- • Actual use description
- • Fire safety classification
- • Existing area (for extensions)
- • Additional building uses (if any)
4
Get Your Results
View your comprehensive compliance report with detailed analysis.
Your Report Will Include
- • Compliance status for all regulations
- • Area calculations and FSI analysis
- • Setback and height compliance
- • Parking and utility requirements
- • Violations and row wise feedback
- • Drawing PDF with dimensions
- • Dimensioned DXF file
- • Link to Project for Construction Permission
Estimated Time: The entire process typically takes 3-5 minutes depending on project complexity. You can navigate back and forth between steps if needed.